Home/For Builders & Contractors
You need the lot ready on the day you said it would be ready. Everything else about a clearing contractor is secondary to that.
A homeowner clearing five acres cares mostly about the price. You care about whether the pad is ready on the 14th, because the concrete is booked, the framer has you penciled in, and every day of slip costs you real money somewhere down the chain.
So we schedule backwards from your date. We tell you a real start day rather than an optimistic one, and if we can’t hold your date we say so on the phone rather than three days out.
Consistent pricing across your lots, so you can bid work without re-quoting the dirt every time.
Repeat customers get first call on machine-days.
No dispatcher, no crew leader, no relay.
A certificate of insurance on file with your additional insured endorsement, so mobilisation isn’t held up by paperwork.
Photographs at each stage for your file and for the client.
One operator means a finite number of machine-days a month. We’d rather tell you our real capacity than take work we can’t service.
| Stage | What we handle |
|---|---|
| Pre-purchase | Walk a lot you’re under contract on and give a real clearing number before you’re committed. |
| Clear | Building envelope plus working room, driveway cut, laydown and turnaround area. |
| Grub | Stumps and root plates out of the pad area. |
| Rough grade | Shaped to the pad, water running away from the structure. |
| Debris | Mulched, windrowed, or burned under a permit in your name, priced each way. |
| After | Post-construction cleanup, final grade prep, driveway finishing. |
We rough grade. A pad that has to hit a compaction specification with a density test behind it is a grading contractor’s job and we’ll tell you that rather than take the work. Utility trenching, septic installation and permitted erosion control to a drawing are all separate trades. Knowing where a subcontractor’s competence ends is worth more to you than one who says yes to everything.
We’re not a multi-crew outfit and we’re not going to pretend to be. If you’re putting up thirty houses a year we’re probably not your only clearing contractor. If you’re putting up two to twelve, a standing arrangement with one operator who knows your standards is usually better service than you’ll get from someone who has you fourth in a queue.
Call John directly: (251) 454-2801
Call and you get John Williams, not an answering service and not a dispatcher. If it’s after hours or a Sunday, send the form and you’ll have a text back and a callback first thing.